Back to CC&R List

CHAPTER 19 - COLOR OF HOUSES, FENCES AND OTHER STRUCTURES    

The following rules shall apply to the color of houses, fences and other structures located in Wekiva.  

19.01 DEFINITION/PAINT AND PAINTED:  

For purposes of this rule the terms "paint", "painted", "re-painting" or "painting" shall refer to the establishment of paint, stain, or other coating of any type (including siding) to the exterior of a house, fence or any other structure in Wekiva.  

19.02 ACC APPROVAL REQUIRED:  

To insure that a consistent and harmonious scheme of exterior colors exist in Wekiva, prior approval by the ACC is required before the exterior of any house, fence or other structure located in Wekiva is painted. This applies to the re-painting as well as the initial painting of any such house, fence or other structure.  

19.03 SUBMITTAL REQUIREMENTS/EXCEPTION:  

 Except as provided below, in addition to the general information required on all ACC applications, all applications for painting must contain the following detailed specifications concerning the proposed color: color, achromatic color, hue, lightness, brightness, saturation, shade, tint and tinge. The ACC may additionally require any proposed color to be submitted on a sample board. Where more than one color or variation of a color is planned, the application must also include the location where each specific color or variation of color will be used. The ACC will review the same and will only approve the color if the same is in harmony with the overall, general and existing scheme of exterior colors in Wekiva. For purposes of this review, the ACC may disregard those limited houses, fences and structures which are presently outside of the overall, general and existing scheme of exterior colors in Wekiva.  

19.04 PRE-APPROVED COLORS:  

The ACC reserves the right, but not the duty, to pre-approve certain colors for use in Wekiva from time to time. These colors may be pre-approved for use on designated areas (e.g. trim, main structure, fences). If the ACC should do so, these colors must also be approved by the Board of Directors with the date of such approval being placed on the approval document (i.e. color chart). These colors will then be placed on file with the Management Company. For all such pre-approved colors, in addition to the general information required on all ACC applications, the application must only reflect the proposed color, and the location that the color will be used.  

19.05 PROHIBITED COLORS:  

The ACC reserves the right, but not the duty, to prohibit certain colors for use in Wekiva from time to time. These colors may be prohibited for use on designated areas (e.g. trim, main structure, fences). If the ACC should do so, these colors must also be prohibited by the Board of Directors with the date of such prohibition being placed on the prohibition document (i.e. color chart). These colors will then be placed on file with the Management Company. These colors may not be used in Wekiva and the ACC will not approve any application for the use of the same.  

07/17/95    

 

Back to CC&R List

 

Back Next